Investment property, fully renovated.

An aging St. Petersburg investment property taken down to its core systems and rebuilt for resale — full electrical, plumbing, and HVAC upgrades, roughly 80% of the ceilings replaced, and a relocated, redesigned kitchen, all delivered on budget and on schedule.

Location

St. Petersburg, FL

Type

Residential

Duration

3 months

Scope

Full gut renovation

Condition

Aging investment property

Systems

Electrical · plumbing · HVAC

License

CGC1536878

Status

Delivered · resale-ready

The Challenge

The client acquired an aging residential property as an investment opportunity and needed a complete renovation to maximize market value, improve functionality, and meet current building standards. The home required extensive upgrades to its core systems, significant interior restoration, and a modernized layout that would appeal to future buyers or tenants. A major challenge was addressing the deteriorated condition of the property while maintaining budget and schedule objectives — approximately 80% of the existing ceilings required replacement, and the outdated floor plan called for a complete kitchen relocation and redesign.

Our Approach

Working under CGC1536878, we sequenced the renovation around the building's core systems first — bringing electrical, plumbing, and mechanical/HVAC up to current code — then moved through new insulation, impact-resistant windows, and the replacement of roughly 80% of the ceilings before interior finishes. Trades, inspections, and permits were coordinated under a single point of contact to protect budget and schedule, and the kitchen was relocated and fully redesigned around a new center island to maximize the home's market appeal.

Project scope / 11 steps

What was delivered.

The complete scope executed under one accountable team — from core-systems upgrades and ceiling replacement through the kitchen redesign, final inspections, and closeout documentation.

/ 01

Complete upgrade of electrical systems to meet current code requirements.

/ 02

Replacement and modernization of plumbing systems throughout the home.

/ 03

Upgrade of mechanical / HVAC systems for improved efficiency and reliability.

/ 04

Demolition and replacement of approximately 80% of existing ceilings due to deterioration.

/ 05

Installation of new insulation throughout the property to improve energy performance.

/ 06

Replacement of existing windows with new energy-efficient, impact-resistant units.

/ 07

Relocation of the kitchen to create a more functional, marketable layout.

/ 08

Complete kitchen redesign, including a new center island and updated finishes.

/ 09

Drywall restoration, interior finishes, painting, and trim installation.

/ 10

Coordination of all trades, inspections, and permit requirements.

/ 11

Final inspections, punch-list completion, and project closeout documentation.

Job site / gallery

Inside the renovation.

Imagery from the St. Petersburg renovation documenting the transformation from gut to finished, resale-ready home.

Outcomes

A fully modernized home, ready for resale.

The property was successfully transformed into a fully modernized residence ready for resale. The comprehensive renovation improved energy efficiency, upgraded all major building systems, enhanced the interior layout, and significantly increased the property's market appeal and investment value.

80%

Ceilings replaced

Demolished & rebuilt

3mo

Project duration

Permit through closeout

100%

Code compliance

All major building systems

1PM

Single point of contact

Principal-led throughout

Start / 01

Let's build something that lasts.

Free site visit, written ballpark in 72 hours, no obligation. Tell us what you're planning — we'll tell you exactly what it takes.